Large embedded generators are those connected to the distribution network and are either:
-
Greater than 5MW, or
-
Less than 5MW and need to be registered with the Australian Energy Market Operator
Information pack
Model connection agreement for embedded generation:
Contestable connection services
There are no contestable services relevant to the connection of large generators in Tasmania.